| Mineral resources and reserves |
| The tables below set out the Mineral Resource and Ore Reserve estimates for Avocet's projects Inata and Souma in Burkina Faso. The Mineral Resource estimation and Ore Reserves have been prepared in accordance with the current (2004 edition) Joint Ore Reserve Committee (JORC) reporting standards. |
| Ore Reserves and Mineral Resources as at 31 December 2011. |
| |
Gross |
Net attributable (90%) |
| |
| Proven |
16,091,000 |
1.72 |
888,000 |
14,482,000 |
1.72 |
799,000 |
| Probable |
17,234,000 |
1.70 |
940,000 |
15,511,000 |
1.70 |
846,000 |
| ROM Stockpiles |
497,000 |
1.22 |
20,000 |
447,000 |
1.25 |
18,000 |
| Measured |
17,881,000 |
1.68 |
964,000 |
16,093,000 |
1.68 |
868,000 |
| Indicated |
39,446,000 |
1.35 |
1,712,000 |
35,501,000 |
1.35 |
1,541,000 |
| Measured + Indicated |
57,327,000 |
1.45 |
2,676,000 |
51,594,000 |
1.45 |
2,409,000 |
| Inferred |
17,846,000 |
1.36 |
8779,000 |
16,061,000 |
1.36 |
701,000 |
|
- Mineral Resources are inclusive of Ore Reserves and reported above 0.5g/t gold cut off.
The Mineral Resource was estimated by Mr David Williams (MAusIMM) of CSA, a Competent
Person as defined by the JORC Code Mineral resources are reported below the 30 June
2011 topographic surface. Rounding errors may occur.
|
| Mineral resource estimate as at 31 October 2010 |
| |
Gross |
Net attributable (100%) |
| |
| Proven |
– |
– |
– |
– |
– |
– |
| Probable |
– |
– |
– |
– |
– |
– |
| ROM Stockpiles |
– |
– |
– |
– |
– |
– |
| Measured |
– |
– |
– |
– |
– |
– |
| Indicated |
324,000 |
1.44 |
15,000 |
324,000 |
1.44 |
15,000 |
| Measured + Indicated |
324,000 |
1.44 |
15,000 |
324,000 |
1.44 |
15,000 |
| Inferred |
10,376,000 |
1.64 |
546,000 |
10,376,000 |
1.64 |
546,000 |
|
- Mineral Resources are inclusive of Ore Reserves and reported above 0.2g/t gold cut off.
The Mineral Resource was estimated by Mr David Williams (MAusIMM) of CSA, a Competent
Person as defined by the JORC Code Mineral resources are reported below the topographic surface.
Rounding errors may occur.
|
| The tables below set out the Mineral Resource estimates for Avocet's Koulékoun project at Tri-K in Guinea. |
| Mineral Resources as at 20 December 2011. |
| |
Gross |
Net attributable (100%) |
| |
| Proven |
– |
– |
– |
– |
– |
– |
| Probable |
– |
– |
– |
– |
– |
– |
| ROM Stockpiles |
– |
– |
– |
– |
– |
– |
| Koulékoun |
| Measured |
– |
– |
– |
– |
– |
– |
| Indicated |
21,610,000 |
1.44 |
1,001,000 |
21,610,000 |
1.44 |
1,001,000 |
| Measured + Indicated |
21,610,000 |
1.44 |
1,001,000 |
21,610,000 |
1.44 |
1,001,000 |
| Inferred |
22,600,000 |
1.15 |
832,200 |
22,600,000 |
1.15 |
832,200 |
| Kodiéran |
| Inferred |
7,260,000 |
1.76 |
411,100 |
7,260,000 |
1.76 |
411,100 |
|
- The resource has been estimated within constraining wireframe solids based on a nominal lower cut off grade of 0.3 g/t Au. The resource is quoted from blocks above 0.5 g/t Au.
The Company owns 100% of Wega Mining Guinée, owner of the Koulékoun gold project and Kodiéran prospect. Note: rounding errors may occur.
|
 |
|
 |
|
|
|
|